1 2
คุณอยู่ที่: Home Lease Space TSP Main Menu TSP Phase II

 

Thailand Science Park Phase II

Phase 2 of the Thailand Science Park, which has been designated “Innovation Cluster 2 (INC 2)”, comprises of 4 inter-connected towers which creates over 124,000 sq.m. of total floor area. INC 2 is built around the concept of “Work-Life Integration”. It is designed to create a conducive environment for technology companies, in which their talented people can live, work and play. INC 2 aims to adapt to the ever-changing needs of today’s knowledge workers.

INC 2 provides its R&D-oriented tenants with a comprehensive suite of business facilities and a superb working environment. The modular design of the four towers of INC 2 makes it easy to accommodate the different needs of R&D intensive companies.

 

Facts & Figure  
Space: Total Gross Area: 124,860 sq.m.
Wet Lab/Dry Lab/Office Space 72,510 sq.m.
Recreation/Common Area 23,700 sq.m.
Meeting Area 1,680 sq.m.
Plaza & Retail 11,170 sq.m.
Parking 12,300 sq.m.
Mechanical & Electrical Bldg. 3,500 sq.m.
Focus Cluster: • Food
• Life Science
• Electronic
Types of Building • 3 Buildings /9-storey research building
• 1 Buildings /11-storey research building
• With car park 2 storey 359 cars
Types of Rental Space: • Bare Space Lab
• Ready-to-Move-In Lab
• Heavy Equipment Lab
• Sensitive Lab



 
 
Building Specification: TSP Phase II

 

Innovation Cluster 2 (INC2)
FLOOR LOADING: Office : 500 kg./sq.m.
Heavy Equip. (1,700 sq.m.) : 2,000 kg./sq.m.
Wet&Dry Lab : 500 kg./sq.m.
Anti-Vibration (280 sq.m.) : 1,000 kg./sq.m
UNIT SIZES: 6.6x12 = 79.2 sq.m./module (Building A,B,C)
6.6x8 = 52.8 sq.m./module (Building D)
COLUMN SPACING: 6.6 M. X 12 M.
6.6 M. X 8 M.
FLOOR HEIGHT:
G-2ND STOREY: 5M.
3RD-11TH STOREY: 4.5 M.
Air Ventilation: 2 Ach + Fume Hood
WATER AND DRAINAGE: Water Pipe: Diameter 20 mm. with Valve and Meter
Emergency Shower/Eye Washer Pipe: Diameter 15 mm.
Drainage:
-
Sink Drain - Diameter 50 mm.
- Floor Drain - Diameter 80 mm.
Modular System Lab: Normal Load: ~3 Phase 40-50A (with kwh Meter)
Essential Load: ~1 Phase 40-50A (with kwh Meter)
UPS Load: ~1 Phase 20A
Grounding System
Computer Rack for IP Phone 2-3 Line