![]() |
![]() |
![]() |
![]() |
| Thailand Science Park Phase II |
|
Phase 2 of the Thailand Science Park, which has been designated “Innovation Cluster 2 (INC 2)”, comprises of 4 inter-connected towers which creates over 124,000 sq.m. of total floor area. INC 2 is built around the concept of “Work-Life Integration”. It is designed to create a conducive environment for technology companies, in which their talented people can live, work and play. INC 2 aims to adapt to the ever-changing needs of today’s knowledge workers. INC 2 provides its R&D-oriented tenants with a comprehensive suite of business facilities and a superb working environment. The modular design of the four towers of INC 2 makes it easy to accommodate the different needs of R&D intensive companies. |
| Facts & Figure | |
| Space: | Total Gross Area: 124,860 sq.m. Wet Lab/Dry Lab/Office Space 72,510 sq.m. Recreation/Common Area 23,700 sq.m. Meeting Area 1,680 sq.m. Plaza & Retail 11,170 sq.m. Parking 12,300 sq.m. Mechanical & Electrical Bldg. 3,500 sq.m. |
| Focus Cluster: | • Food • Life Science • Electronic |
| Types of Building | • 3 Buildings /9-storey research building • 1 Buildings /11-storey research building • With car park 2 storey 359 cars |
| Types of Rental Space: | • Bare Space Lab • Ready-to-Move-In Lab • Heavy Equipment Lab • Sensitive Lab |

| Building Specification: TSP Phase II |
| Innovation Cluster 2 (INC2) | |
| FLOOR LOADING: | Office : 500 kg./sq.m. Heavy Equip. (1,700 sq.m.) : 2,000 kg./sq.m. Wet&Dry Lab : 500 kg./sq.m. Anti-Vibration (280 sq.m.) : 1,000 kg./sq.m |
| UNIT SIZES: | 6.6x12 = 79.2 sq.m./module (Building A,B,C) 6.6x8 = 52.8 sq.m./module (Building D) |
| COLUMN SPACING: | 6.6 M. X 12 M. 6.6 M. X 8 M. |
| FLOOR HEIGHT: |
G-2ND STOREY: 5M. 3RD-11TH STOREY: 4.5 M. |
| Air Ventilation: | 2 Ach + Fume Hood |
| WATER AND DRAINAGE: | Water Pipe: Diameter 20 mm. with Valve and Meter Emergency Shower/Eye Washer Pipe: Diameter 15 mm. Drainage: - Sink Drain - Diameter 50 mm. - Floor Drain - Diameter 80 mm. |
| Modular System Lab: | Normal Load: ~3 Phase 40-50A (with kwh Meter) Essential Load: ~1 Phase 40-50A (with kwh Meter) UPS Load: ~1 Phase 20A Grounding System Computer Rack for IP Phone 2-3 Line |



















