1 2
現在地: Home Lease Space Rental Space Specification and Fee

 

Thailand Science Park Phase I

Thailand Science Park is the country most attractive location to invest in research, development and innovation activities, with more than sixty companies, four research institutes, three universities and one medical school. Established in 2002, the present day Thailand Science Park has high-level activities in the areas of Biotechnology, Information Technology, Metals and Materials Technology and Nanotechnology. The technologies provide strong supports for the businesses in the areas of Agriculture and Food, Health and Medicine, Energy and Environment.

With well-equipped physical and knowledge infrastructure that encourages companies to innovate technological-based products and services, corporate tenants can utilize the park’s facilities to develop innovations to serve the market much faster and, importantly, with cost-efficiency.

 

Facts & Figure  
Established:
2002
Area: 200 Rais (80 Acres)
Space: Total 140,000 sq.m.
Utilizable 99,000 sq.m.
Rental 11,402 sq.m.
Flagship: • National Science and Technology Development Agency (NSTDA)
• National Center for Genetic Engineering and Biotechnology (BIOTEC)
• National Electronics and Computer Technology Center (NECTEC)
• National Metal and Materials Technology Center (MTEC)
• National Nanotechnology Center (NANOTEC)
• Technology Management Center (TMC)
Types of Space: • Wet Lab/Dry Lab
• Pilot Plant
• Long Term Leasehold Land
TSP Phase 1
1. Central Office Bldg. (Incubator Wing)
2. Innovation Cluster 1 Bldg.
3. Garden of Innovation
4. NECTEC Bldg.
5. BIOTEC Bldg.
6. MTEC Bldg.
7. NECTEC Pilot Plant
8. BIOTEC Pilot Plant

 

Building Specification: TSP Phase I

 

1. Central Office Building (Incubator Wing)
Floor Loading: 300 kg/sq.m.
Electric System: TR : 2000 kVA (1 Unit)
Gen. : 300 KVA
Pipe System: Main Pipe - Diameter 4" with Valve and Meter
Telephone system: PABX 50/400
Air Condition system: 4 of Air Cool Water-size 235.3 Tons, Totally 941.2 Tons
CCTV System: On all floors
Access Control: Provided 1 set/Room
Elevator: 3 Elevators and 1 Heavy Loading Elevator(1150 kg)

 

2. Innovation Cluster 1 Building
Floor Loading: 300 kg/sq.m.
Electric System: 250KVA Generator
2Unit of Adaptors, 800KVA
Pipe System: Main Pipe - Diameter 2( 1/2)" with Valve and Meter
Telephone system: External line, Analog-16 circuits and ISDN 1 E-one
Air Condition system: Split type
CCTV System: 4 units of CCTV (only 1st Floor)
Access Control: Room 306 and 309
Elevator: 1 Heavy Loading Elevator (1150 kg)

 

3. Garden of Innovation
Floor Loading: 300 kg/sq.m.
Electric System: 200A 3ph.
250KVA Generator จาก อาคาร INC1
Pipe System: Main Pipe - Diameter 2( 1/2)" with Valve and Meter
Telephone system: External line, Analog-50 circuits
Air Condition system: Split type
CCTV System: 5 units of CCTV (only 1st Floor)
Access Control: Main Entrance
Elevator: n/a

 

4. NECTEC Building
Floor Loading: Operation Room: 500 kg./sq.m.
Electric System: 60AT 3ph.
Pipe System: n/a
Telephone system: 10 lines
Air Condition system: Central Air System : 8.00-18.00
CCTV System: 1st Floor and inside Elevator
Access Control: Main Entrance (Tenant can set up their own system)
Elevator: 3 Elevators and 1 Heavy Loading Elevator(1150 kg)

 

5. BIOTEC Building
Floor Loading: Lab: 1000 kg./sq.m. , Office: 300 kg./sq.m. ,
Deck: 800 kg./sq.m.
Electric System: TR : 2000 kVA (2 Units) - Gen. 1200 kVA.
Pipe System: Main Pipe - Diameter 4" and Reserved Tank 210 m3
Telephone system: 130 Lines - Through PABX 48 Lines
Air Condition system: 5 of Air Cool Water-size 1,277 Tons
60 of Split Type-size 199.36 Tons
CCTV System: Provided
Access Control: 62 Bolts - PC Work Station
Elevator: 2 Elevators and 1 Heavy Loading Elevator(1150 kg)

 

6. MTEC Building
Floor Loading: Operation Room: 1,000 kg./sq.m.
Electric System: 380/220V
Pipe System: Diameter 20 mm. with Valve and Meter
Telephone system: 14 lines free
Air Condition system: Chiller Duct Type
CCTV System: Future Plan
Access Control: All Floor
Elevator: 2 Elevators and 1 Heavy Loading Elevator(1150 kg)

 

7. NECTEC Pilot Plant
Floor Loading: Operation Room: 500 kg./sq.m.
Electric System: 60AT 3ph.
Pipe System: Diameter 1/4" (in some areas)
Telephone system: 24 Internal Lines
Air Condition system: Split type (in some areas)
CCTV System: n/a
Access Control: 2nd Floor
Elevator: 1 Elevators (1000 kg)

 

8. BIOTEC Pilot Plant
Floor Loading: 1st Floor: 1000 kg./sq.m.
2nd - 3rd Floor: 500kg./sq.m.
Deck: 250 kg./sq.m.
Electric System: TR1 : 1000 kVA, TR2 630 kVA. - Gen. 100 kVA
Pipe System: Main Pipe - Diameter 2" and Reserved Tank 210 m3
Telephone system: 2 Direct Phone no. - 8 Internal Phone no.
Air Condition system: Split Type 20 Units(Not include rental room) : 49 Tons
CCTV System: n/a
Access Control: 8 Bolts - PC Work Station
Elevator: n/a